Results of tm's Battle

Permalink
Lobby Squad Battle (Twin)
Mode Splat Zones
Stage Walleye Warehouse
Weapon Splattershot Jr. (Splat Bomb / Bubbler)
Rank S+ 44 S+ 44
Level 50 ?
Result Knockout Won
Rank in Team 3
Kills / Deaths 6 / 5 >
Kill Ratio 1.20
Kill Rate 54.5%
Cause of Death
Krak-On Splat Roller : 3 times
Rapid Blaster : 2 times
Cash ? 337,092
Gear
Headgear Clothing Shoes
Primary Ability Special Charge Up Cold-Blooded Ink Resistance Up
Secondary Abilities Ink Recovery Up Ink Recovery Up Swim Speed Up
Special Charge Up Ink Recovery Up Swim Speed Up
Ink Recovery Up Special Charge Up Swim Speed Up

Ability Effect

Battle Start ?
Battle End (10 years ago)
Data Sent (10 years ago)
User Agent IkaLog / da38180_20160128_220730_WinIkaLog
Game Version 2.6.0
Weapon Level Rank k/d Ratio Rate
Good Guys 31 / 24 1.29 56.4%
Octobrush 50 S 10 / 4 > 2.50 71.4%
Carbon Roller 50 S+ 10 / 7 > 1.43 58.8%
Splattershot Jr. 50 S+ 6 / 5 > 1.20 54.5%
Tentatek Splattershot 50 S 5 / 8 < 0.62 38.5%
Bad Guys 24 / 31 0.77 43.6%
Krak-On Splat Roller 50 S+ 9 / 10 < 0.90 47.4%
E-liter 3K Scope 50 S+ 7 / 4 > 1.75 63.6%
Gold Dynamo Roller 50 S 4 / 7 < 0.57 36.4%
Rapid Blaster 50 S 4 / 10 < 0.40 28.6%

Ability Effect

Damage100.0% [28.0 × 100.0% = 28.0]
Defense Up Primary Ability
0 1 2 3
Secondary Abilities 0 28.0 26.6 25.4 24.5
1 27.5 26.2 25.1 24.3
2 27.1 25.9 24.8 24.1
3 26.7 25.5 24.6 23.9
4 26.3 25.2 24.4 23.8
5 26.0 24.9 24.2 23.6
6 25.6 24.7 24.0 23.5
7 25.3 24.4 23.8 23.4
8 25.0 24.2 23.7 23.4
9 24.8 24.0 23.5 23.3
Defense100.0%
Ink Usage(Main)100.0%
Ink Usage(Sub)100.0%
Ink Recovery2.53 seconds (118.4 %)
Run Speed100.0%
Swim Speed106.9% (Splattershot Jr.)
Special Charge158 p (Bubbler)
Special Duration5.00 seconds (Bubbler)
Special Save50.0 % loss (Splattershot Jr.)
Respawn8.50 seconds
Jump1.00 seconds + 2.00 seconds + 0.67 seconds + 0.17 seconds = 3.83 seconds
Bomb Throw100.0%
Echolocator25.0%

[2.6.0]
Powered by ギアパワー検証 - スプラトゥーン(Splatoon) for 2ch Wiki*