Results of すぉたん's Battle

Permalink
Lobby Solo Queue
Mode Turf War
Stage Hammerhead Bridge
Weapon Splattershot Jr. (Splat Bomb / Bubbler)
Level 50 ?
Result Won
Rank in Team 2
Kills / Deaths 3 / 4 <
Kill Ratio 0.75
Kill Rate 42.9%
Max Kill Combo 1
Max Kill Streak 2
Cause of Death
Carbon Roller : 3 times
Dual Squelcher : 1 time
Turf Inked + Bonus 682 + 1,000 P
Cash ? 4,949,809
Gear
Headgear Clothing Shoes
Primary Ability Swim Speed Up Special Charge Up Ink Resistance Up
Secondary Abilities Swim Speed Up Swim Speed Up Special Charge Up
Ink Saver (Sub) Swim Speed Up Damage Up
Ink Saver (Sub) Swim Speed Up Quick Super Jump

Ability Effect

Battle Start (9 years ago)
Battle End (9 years ago)
Data Sent (9 years ago)
User Agent IkaLog / 579408a_20160609_005508_WinIkaLog
Extra Data
Input Class VideoCapture
Primary Language ja
Game Version 2.10.0
Weapon Level Points k/d Ratio Rate
Good Guys 2,642 18 / 14 1.29 56.2%
Neo Splash-o-matic 50 1,727 6 / 5 > 1.20 54.5%
Splattershot Jr. 50 1,682 3 / 4 < 0.75 42.9%
CoroCoro Splat Roller 50 1,661 5 / 2 > 2.50 71.4%
Splat Charger 50 1,572 4 / 3 > 1.33 57.1%
Bad Guys 2,298 14 / 18 0.78 43.8%
N-ZAP '89 50 781 3 / 4 < 0.75 42.9%
Dual Squelcher 30 686 2 / 5 < 0.40 28.6%
Carbon Roller 50 462 6 / 5 > 1.20 54.5%
Carbon Roller 48 369 3 / 4 < 0.75 42.9%

Ability Effect

Damage102.9% [28.0 × 102.9% = 28.8]
Defense Up Primary Ability
0 1 2 3
Secondary Abilities 0 28.8 27.0 25.9 25.0
1 28.0 26.7 25.6 24.7
2 27.6 26.3 25.3 24.5
3 27.2 26.0 25.0 24.4
4 26.8 25.7 24.8 24.2
5 26.4 25.4 24.6 24.1
6 26.1 25.1 24.4 24.0
7 25.8 24.9 24.3 23.9
8 25.5 24.7 24.1 23.8
9 25.2 24.5 24.0 23.8
Defense100.0%
Ink Usage(Main)100.0%
Ink Usage(Sub)93.4%
Ink Recovery3.00 seconds (100.0 %)
Run Speed100.0%
Swim Speed114.9% (Splattershot Jr.)
Special Charge161 p (Bubbler)
Special Duration4.50 seconds (Bubbler)
Special Save60.0 % loss (Splattershot Jr.)
Respawn8.50 seconds
Jump0.95 seconds + 1.90 seconds + 0.67 seconds + 0.17 seconds = 3.69 seconds
Bomb Throw100.0%
Echolocator100.0%

[2.9.0]
Powered by ギアパワー検証 - スプラトゥーン(Splatoon) for 2ch Wiki*