Results of saradisk's Battle

Permalink
Lobby Solo Queue
Mode Splat Zones
Stage Blackbelly Skatepark
Weapon Dynamo Roller (Sprinkler / Echolocator)
Rank S 33 S 36
Level 42 ?
Result Knockout Won
Rank in Team 1
Kills / Deaths 6 / 2 >
Kill Ratio 3.00
Kill Rate 75.0%
Cause of Death
Splattershot Pro : 1 time
Burst Bomb : 1 time
Cash ? 365,907
Gear
Headgear Clothing Shoes
Primary Ability Last-Ditch Effort Damage Up Stealth Jump
Secondary Abilities Bomb Sniffer Swim Speed Up Bomb Sniffer
Bomb Sniffer Ink Recovery Up Bomb Range Up
Last-Ditch Effort Ink Recovery Up Tenacity

Ability Effect

Battle Start (10 years ago)
Battle End (10 years ago)
Data Sent (10 years ago)
User Agent IkaLog / da38180_20160128_220730_WinIkaLog
Game Version 2.5.0
Weapon Level Rank k/d Ratio Rate
Good Guys 15 / 6 2.50 71.4%
Dynamo Roller 42 S 6 / 2 > 3.00 75.0%
Dynamo Roller 48 S 4 / 2 > 2.00 66.7%
Splattershot Jr. 50 S 2 / 2 = 1.00 50.0%
Kelp Splat Charger 48 A+ 3 / 0 > 99.99 100.0%
Bad Guys 6 / 15 0.40 28.6%
Octoshot Replica 50 A+ 2 / 2 = 1.00 50.0%
E-liter 3K Scope 40 A+ 1 / 3 < 0.33 25.0%
Kelp Splat Charger 50 A+ 0 / 5 < 0.00 0.0%
Splattershot Pro 41 A+ 3 / 5 < 0.60 37.5%

Ability Effect

Damage109.1% [125.0 × 109.1% = 136.4]
Defense Up Primary Ability
0 1 2 3
Secondary Abilities 0 136.4 125.0 119.8 115.8
1 132.7 123.3 118.5 114.8
2 129.3 121.8 117.2 113.9
3 126.0 120.3 116.1 113.1
4 123.9 118.9 115.1 112.4
5 122.3 117.6 114.1 111.8
6 120.8 116.5 113.3 111.3
7 119.4 115.4 112.6 110.9
8 118.1 114.4 112.0 110.6
9 116.9 113.6 111.4 110.4
Defense100.0%
Ink Usage(Main)100.0%
Ink Usage(Sub)100.0%
Ink Recovery2.78 seconds (107.8 %)
Run Speed100.0%
Swim Speed102.4% (Dynamo Roller)
Special Charge200 p (Echolocator)
Special Duration12.00 seconds (Echolocator)
Special Save50.0 % loss (Dynamo Roller)
Respawn8.50 seconds
Jump1.00 seconds + 2.00 seconds + 0.67 seconds + 0.17 seconds = 3.83 seconds
Bomb Throw104.8%
Echolocator100.0%

[2.5.0]
Powered by ギアパワー検証 - スプラトゥーン(Splatoon) for 2ch Wiki*