Results of d's Battle

Permalink
SplatNet Battle #15,950
ModeTower Control - Private Battle
StagePort Mackerel
Weapon
Custom Dualie Squelchers (Splat Bomb, Ink Storm)
Increase damage
RankS+ 1 → S+ 1
Level22 → 22
ResultKnockout Won
Final Count
100
0
Rank in Team3
Kills / Deaths
3 + 0 / 3 =
Kill Ratio: 1.00
Specials3
Turf Inked921P
Gear
Headgear Clothing Shoes
Gear Takoroka MeshNegative Longcuff SweaterSquid-Stitch Slip-Ons
Primary Ability
Secondary Abilities
Gear AbilitiesEffects
Main Power Up
4.5Damage: 33.2 = 28.0×118.8%
Ink Saver (Main)
0.6Default×91.53%
Bomb Defense Up DX
0.3
Ink Resistance Up
0.3DoT: 0.2 per frame
DoT Delay: 10 frames (0.167 sec.)
DoT Cap: 38.1
Run Speed: Default×139.4%
Shooting: Default×175.1%
"DoT": "Damage over time"
Battle Start (4 years ago)
Battle End (4 years ago)
Elapsed Time3:43 (223 seconds)
Data Sent (4 years ago)
User Agentsplatnet2statink / 1.5.10
Extra Data
Upload ModeManual
Game Version5.4.0
StatsPrivate Battle
Name Weapon Level Rank Inked k+a/sp k/d Ratio/
Rate
Good Guys 3,503 20 / 17 1.18
54.05%
HTL_てんOctoling
Kensa Splattershot Pro 4 X 1,085 15 (2) / 2 13 / 4 3.25
76.47%
ƒƒ♪かあInkling
Gold Dynamo Roller 20 X 805 6 (4) / 3 2 / 6 0.33
25.00%
Custom Dualie Squelchers 22 S+ 921 3 (0) / 3 3 / 3 1.00
50.00%
qq◇おとよん◇ppInkling
E-liter 4K 99 S 692 2 (0) / 3 2 / 4 0.50
33.33%
Bad Guys 3,390 17 / 20 0.85
45.95%
いもザムライOctoling
Kensa .52 Gal 34 X 1,007 7 (0) / 5 7 / 5 1.40
58.33%
うきょうInkling
Carbon Roller 19 S+ 868 7 (2) / 4 5 / 4 1.25
55.56%
ken_ucOctoling
N-ZAP '85 50 S+ 892 5 (0) / 3 5 / 6 0.83
45.45%
kamyInkling
Splat Charger 81 X 623 1 (1) / 2 0 / 5 0.00
0.00%