Results of Ice's Battle

Permalink
Lobby Squad Battle (Tri)
Mode Rainmaker
Stage Arowana Mall
Weapon Kelp Splat Charger (Sprinkler / Killer Wail)
Rank S+ 14 S+ 14
Level 50 ?
Result Time is up Lost
Rank in Team 3
Kills / Deaths 5 / 8 <
Kill Ratio 0.62
Kill Rate 38.5%
Max Kill Combo 1
Max Kill Streak 2
Cause of Death
E-liter 3K Scope : 3 times
N-ZAP '83 : 2 times
Splat Bomb : 1 time
Rainmaker Shot : 1 time
Wasabi Splattershot : 1 time
Cash ? 8,428,669
Gear
Headgear Clothing Shoes
Primary Ability Swim Speed Up Special Charge Up Ink Resistance Up
Secondary Abilities Run Speed Up Ink Saver (Main) Special Saver
Swim Speed Up Damage Up Damage Up
Damage Up Damage Up Damage Up

Ability Effect

Battle Start (9 years ago)
Battle End (9 years ago)
Data Sent (9 years ago)
User Agent IkaLog / b1915d2_20160610_105425_WinIkaLog
Extra Data
Input Class VideoCapture
Primary Language en_NA
Game Version 2.12.0
Weapon Level Rank k/d Ratio Rate
Bad Guys 31 / 33 0.94 48.4%
N-ZAP '85 37 A 11 / 12 < 0.92 47.8%
Wasabi Splattershot 43 S 9 / 7 > 1.29 56.2%
Splash-o-matic 50 S 6 / 9 < 0.67 40.0%
E-liter 3K Scope 50 S+ 5 / 5 = 1.00 50.0%
Good Guys 33 / 31 1.06 51.6%
Luna Blaster 50 S+ 17 / 14 > 1.21 54.8%
Octoshot Replica 50 S 11 / 9 > 1.22 55.0%
Kelp Splat Charger 50 S+ 5 / 8 < 0.62 38.5%

Ability Effect

Damage113.0% [160.0 × 113.0% = 180.8]
Defense Up Primary Ability
0 1 2 3
Secondary Abilities 0 180.8 166.3 156.9 151.7
1 176.2 162.4 155.1 150.4
2 171.8 159.3 153.6 149.2
3 167.6 157.5 152.1 148.2
4 163.7 155.7 150.8 147.3
5 160.0 154.1 149.6 146.6
6 158.1 152.6 148.5 145.9
7 156.3 151.2 147.6 145.4
8 154.6 150.0 146.8 145.1
9 153.1 148.9 146.1 144.8
Defense100.0%
Ink Usage(Main)95.7%
Ink Usage(Sub)100.0%
Ink Recovery3.00 seconds (100.0 %)
Run Speed104.8%
Swim Speed109.6% (Kelp Splat Charger)
Special Charge147 p (Killer Wail)
Special Duration6.00 seconds (Killer Wail)
Special Save55.2 % loss (Kelp Splat Charger)
Respawn8.50 seconds
Jump1.00 seconds + 2.00 seconds + 0.67 seconds + 0.17 seconds = 3.83 seconds
Bomb Throw100.0%
Echolocator100.0%

[2.9.0]
Powered by ギアパワー検証 - スプラトゥーン(Splatoon) for 2ch Wiki*