Results of だいちゃ's Battle

Permalink
Lobby Splatfest
Mode Turf War
Stage Ancho-V Games
Weapon Octoshot Replica (Suction Bomb / Inkzooka)
Level 50 ?
Splatfest Title *** Defender ?
Result Won
Rank in Team 3
Kills / Deaths 7 / 0 >
Kill Ratio 99.99
Kill Rate 100.0%
Cash ? 7,164,548
Gear
Headgear Clothing Shoes
Primary Ability Bomb Range Up Special Saver Last-Ditch Effort
Secondary Abilities Special Duration Up Swim Speed Up Quick Respawn
Bomb Sniffer Quick Super Jump Swim Speed Up
Last-Ditch Effort (Locked) Swim Speed Up

Ability Effect

Battle Start (10 years ago)
Battle End (10 years ago)
Data Sent (10 years ago)
User Agent IkaLog / f2a9c82_20160122_153142_WinIkaLog
Game Version 2.5.0
Weapon Level k/d Ratio Rate
Good Guys 23 / 4 5.75 85.2%
Splattershot Jr. 46 4 / 2 > 2.00 66.7%
Dynamo Roller 37 10 / 1 > 10.00 90.9%
Octoshot Replica 50 7 / 0 > 99.99 100.0%
E-liter 3K Scope 50 2 / 1 > 2.00 66.7%
Bad Guys 4 / 24 0.17 14.3%
Splattershot Jr. 22 1 / 6 < 0.17 14.3%
Aerospray RG 39 1 / 4 < 0.25 20.0%
Aerospray RG 50 1 / 9 < 0.11 10.0%
Inkbrush Nouveau 18 1 / 5 < 0.20 16.7%

Ability Effect

Damage100.0% [35.0 × 100.0% = 35.0]
Defense Up Primary Ability
0 1 2 3
Secondary Abilities 0 35.0 33.2 31.8 30.6
1 34.4 32.8 31.4 30.4
2 33.9 32.3 31.1 30.1
3 33.4 31.9 30.7 29.9
4 32.9 31.5 30.5 29.7
5 32.5 31.2 30.2 29.5
6 32.0 30.8 30.0 29.4
7 31.7 30.5 29.8 29.3
8 31.3 30.3 29.6 29.2
9 31.0 30.0 29.4 29.1
Defense100.0%
Ink Usage(Main)100.0%
Ink Usage(Sub)100.0%
Ink Recovery3.00 seconds (100.0 %)
Run Speed100.0%
Swim Speed106.9% (Octoshot Replica)
Special Charge220 p (Inkzooka)
Special Duration6.23 seconds, 6 times (Inkzooka)
Special Save34.8 % loss (Octoshot Replica)
Respawn8.11 seconds
Jump0.95 seconds + 1.90 seconds + 0.67 seconds + 0.17 seconds = 3.69 seconds
Bomb Throw115.2%
Echolocator100.0%

[2.5.0]
Powered by ギアパワー検証 - スプラトゥーン(Splatoon) for 2ch Wiki*