Results of めぐらしい's Battle

Permalink
Lobby Squad Battle (Quad)
Mode Rainmaker
Stage Bluefin Depot
Weapon Octoshot Replica (Suction Bomb / Inkzooka)
Rank S+ 37 S+ 37
Level 50 ?
Result Time is up Won
Rank in Team 4
Kills / Deaths 3 / 6 <
Kill Ratio 0.50
Kill Rate 33.3%
Max Kill Streak 1
Cause of Death
Splattershot Jr. : 3 times
.52 Gal : 1 time
Splash Wall : 1 time
Octobrush Nouveau : 1 time
Cash ? 7,711,389
Gear
Headgear Clothing Shoes
Primary Ability Comeback Damage Up Ink Resistance Up
Secondary Abilities Run Speed Up Damage Up Run Speed Up
Special Duration Up Run Speed Up Run Speed Up
Quick Respawn Run Speed Up Defense Up

Ability Effect

Battle Start (8 years ago)
Battle End (8 years ago)
Data Sent (8 years ago)
User Agent IkaLog / b1915d2_20160610_105425_WinIkaLog
Extra Data
Input Class VideoCapture
Primary Language ja
Game Version 2.12.0
Weapon Level Rank k/d Ratio Rate
Good Guys 33 / 30 1.10 52.4%
Custom Range Blaster 50 S+ 13 / 6 > 2.17 68.4%
Luna Blaster Neo 50 S+ 9 / 8 > 1.12 52.9%
Dynamo Roller 50 S+ 8 / 10 < 0.80 44.4%
Octoshot Replica 50 S+ 3 / 6 < 0.50 33.3%
Bad Guys 30 / 35 0.86 46.2%
Splattershot Jr. 37 A+ 14 / 10 > 1.40 58.3%
Octobrush Nouveau 47 A 6 / 9 < 0.67 40.0%
.52 Gal 50 S+ 6 / 10 < 0.60 37.5%
E-liter 3K Scope 21 A 4 / 6 < 0.67 40.0%

Ability Effect

Damage111.5% [35.0 × 111.5% = 39.0]
Defense Up Primary Ability
0 1 2 3
Secondary Abilities 0 39.0 35.8 34.0 32.9
1 38.0 35.0 33.6 32.6
2 37.0 34.6 33.3 32.3
3 36.1 34.1 33.0 32.1
4 35.3 33.8 32.7 31.9
5 34.7 33.4 32.4 31.8
6 34.3 33.1 32.2 31.6
7 33.9 32.8 32.0 31.5
8 33.5 32.5 31.8 31.4
9 33.2 32.3 31.7 31.4
Defense102.9%
Ink Usage(Main)100.0%
Ink Usage(Sub)100.0%
Ink Recovery3.00 seconds (100.0 %)
Run Speed121.7%
Swim Speed100.0% (Octoshot Replica)
Special Charge220 p (Inkzooka)
Special Duration6.35 seconds, 6 times (Inkzooka)
Special Save75.0 % loss (Octoshot Replica)
Respawn8.11 seconds
Jump1.00 seconds + 2.00 seconds + 0.67 seconds + 0.17 seconds = 3.83 seconds
Bomb Throw100.0%
Echolocator100.0%

[2.9.0]
Powered by ギアパワー検証 - スプラトゥーン(Splatoon) for 2ch Wiki*